Construction of a new gate station to replace the existing facilities on Candia Road in Manchester, NH.
The heavily trafficked area necessitated very detailed construction safety plans to ensure the safety of all involved daily.
Devised a solution to overcome COVID related material delays while limiting schedule impacts by utilizing the new and permanent pressure relieving valve risers to install a bypass to distribute gas to the City of Manchester and keep the existing gate station online through the majority of construction.
Prefabrication and installation of the piping for the boilers, glycol tanks, heat exchangers and other equipment in the facility.
Self-performed the concrete foundation for the regulator building and utilized precast solutions for the DAC building, generator and odorant pads in order to reduce onsite impact.