Town of Groton, MA

Groton, MA

Client:
Town of Groton, MA
Location:
Groton, MA
Project:
Water Treatment Facility
Division:
Mechanical Construction
Architect:
Environmental Partners Group
Design Engineer:
Not Available
Construction Manager:
Not Available
Contract Value:
Not Available
Project Overview:
Construct Whitney Pond Greensand Iron & Manganese Filtration System (1,200 GPM) Water Treatment Plant at the existing Whitney Pond Well 1 & 2 in the Town of Groton, MA.
  • Pre-engineered 72’ x 48’ metal building to include heating, ventilation, plumbing, fire protection system electrical, instrumentation and SCADA.
  • Install 40’x20’, 45,000 gallon backwash supply underground holding tank to facilitate backwashing of the pressure filters and disposal of
    backwash waste to new lagoons.
  • Modified and installed new site piping, site work for drainage, water, drain, electrical and all site/civil surface finishes.