Construct Whitney Pond Greensand Iron & Manganese Filtration System (1,200 GPM) Water Treatment Plant at the existing Whitney Pond Well 1 & 2 in the Town of Groton, MA.
Pre-engineered 72’ x 48’ metal building to include heating, ventilation, plumbing, fire protection system electrical, instrumentation and SCADA.
Install 40’x20’, 45,000 gallon backwash supply underground holding tank to facilitate backwashing of the pressure filters and disposal of
backwash waste to new lagoons.
Modified and installed new site piping, site work for drainage, water, drain, electrical and all site/civil surface finishes.