Franklin Water Treatment Plant

Franklin, MA

Client:
Town of Franklin, MA
Location:
Franklin, MA
Project:
Water Treatment Facility
Division:
Mechanical Construction
Architect:
Not Available
Design Engineer:
Tata and Howard
Construction Manager:
Not Available
Contract Value:
Not Available
Project Overview:

Constructed a 6,492-square-foot facility containing two Koch membrane filter systems with 16 cylinders, 10 inches wide by 48 inches long, made of hollow fiber membranes designed to remove iron and manganese to 0.03 mg/l

Previous Project
Next Project

Have a project you'd like to discuss?

Let's Get Started