Project Overview:
  • Constructed new 40.7-mgd Combined Sewer Overflow wastewater treatment facility at Jones Ferry Road and Water Pollution Control facility lab expansion at Medina Street
  • Controlled 40-foot deep excavation with groundwater from adjacent Connecticut River with 100 well-point dewatering system in operation for over one year during foundation construction
  • Self-performed process mechanical installation, including mechanical screens, conveyor, submersible main lift pumps, dewatering pumps, flushing systems, slide gates, and flap valves
  • Constructed high flow bypass structure over 72-inch CSO main in the street; upon completion of new facility process testing, removed a section of 72-inch main to divert flow to new facility
  • Managed two-year construction project for 18,000-square-foot facility