Design/Build Project with three engineering firms to provide civil, electrical, mechanical, and process design for a landfill gas processing and distribution system to a paper mill 3 miles away. The Design/Build process included coordination with the owner’s engineer’s concurrent design of other LFG processing equipment upgrades. We furnished and installed the new LFG compression and drying equipment along with associated piping, enclosures, and electrical/controls. R.H. White also performed the construction of the owner’s engineer’s design to include a new LFG blower and associated piping, enclosures and electrical/controls. In addition, R.H. White installed the 6” HDPE pipeline several miles through steep off-road terrain with ledge removal and environmental permitting required.